সিদ্ধিরগঞ্জ ২x১২০মেঃ ওঃ পিকিং পাওয়ার প্লান্ট

 
 Siddhirganj 2x120 MW Peaking Power Plant, Siddhirganj, Narayonganj
 
      
 
 
 
Plant Location:  Siddhirganj, Narayanganj.
 
Fuel:  Natural Gas
 
EPC Contract Price: 108.48 Million USD+353.20 Million BDT
 
Financed By: Asian Development Bank (ADB), GOB.
 
Total Capacity: 210 MW (As per PPA)
 
Current Dependable Capacity ( Effective From 09/12/2023): 210 MW
 
EPC Contractor: Bharat Heavy Electricals Limited (BHEL), India.
 
Table: Dependable Capacity History

Sl. No.

Dependable Capacity (MW)

Effective Date

01

199.8882

05.02.2012 (COD)

02

209.5437

06.05.2015

03

210

22.09.2018

04

209.356

12.07.2020

05

208.615

22.10.2021

06

210

26.11.2022

07

210

09.12.2023

 

Unit Name

GT-1

Unit Description

Machine No: GT 171, AIR IN: 35°C, Altitude: 4.5 Meter Above MSL,

Base: 108.600 MW (Gross),

Compressor Stages: 17, RPM: 3000,

Power Turbine Stages: 3, RPM: 3000

COD: 05/02/2012

Fuel Type: Natural Gas

Manufacturar: BHEL

Thermal Efficiency: 31% (Appx.) 

 

Unit Name

GT-2

Unit Description

Machine No: GT 172, AIR IN: 35°C, Altitude: 4.5 Meter Above MSL,

Base: 108.600 MW (Gross),

Compressor Stages: 17, RPM: 3000,

Power Turbine Stages: 3, RPM: 3000

COD: 05/02/2012

Fuel Type: Natural Gas

Manufacturar: BHEL

Thermal Efficiency: 31% (Appx.) 

 

 

Executive Agency Electricity Generation Company of Bangladesh Ltd.
EGCB Cost 0.00
DPA Cost 77,000.00
GOB Cost 47,563.00
Total Costs 124,563.00
Signing Date 2007-01-31
Configuration 1GT:1GT
Operation Date 2012-02-05
Capacity  210 MW
LTSA

14 LTSA Long Term Service Agreement (LTSA) signed on 31-10-2013 for a

period of six (6) years with (1) BHEL, India for Generation and BOP

portion and with (2) BGGTS for CI/HGPI/MI of GT portion.